• Definition and roadmap preparation to implement document output management (create, generate, distribute) with ISIS Papyrus
• Collect all requirements to generate output (business & IT departments)
• GAP-analysis (workload to modify & streamline output streams)
• Budgetting & staffing
Phase: business requirements, preparation
Showing posts with label roadmap. Show all posts
Showing posts with label roadmap. Show all posts
Tuesday, 24 November 2009
2004.01 – 2004.10 / EDP transformation of consumer credit
• Strategic transformation of the EDP environment (financial platform for consumer credit solution, back- & frontoffice) in order to improve time-to-market
• Empower the roadmap with the phases of RFI, RFP, vendor selection step, contract, hand-over to implementation)
Phases: Preparation till Production cutover
• Empower the roadmap with the phases of RFI, RFP, vendor selection step, contract, hand-over to implementation)
Phases: Preparation till Production cutover
Labels:
Preparation,
Production cut over,
RFI,
RFP,
roadmap,
search,
selection,
Strategy design,
Transformation
2000.03 – 2000.12 / CMS implementation
• Transition from a paper model to an electronic flux between the hospitals and the social security to permit electronic validation of viability of patients
• Audit & roadmap design (business fit, GAP assessment, legacy interfacing) for a Content & Document Management System
Phases: Preparation till Production cutover
• Audit & roadmap design (business fit, GAP assessment, legacy interfacing) for a Content & Document Management System
Phases: Preparation till Production cutover
Subscribe to:
Posts (Atom)